Bored pier inspection in Riverstone

Depth, diameter and cage, confirmed while the bore is still open.

  • After boring and cage placement, before concrete
  • About 1 hour on site
  • Report within 24 hours
Price your Riverstone inspectionSend the address and what you need.

Fully licensed & accredited

Stage1 of 7
When to bookAfter boring and cage placement, before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Riverstone bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Riverstone builds

Piers turn up on Riverstone lots where the footing must reach through fill or soft alluvial ground, and on land near the creek lines that flooded in 2021 that is not unusual. Depth is the whole exercise and concrete ends any chance of confirming it. Every photograph on this page was taken at practical completion, not at this stage. They are here because each one is an item that belongs earlier in the build and survived to handover, which is the clearest argument we can make for inspecting when the work is still open.

What we find at this stage in Riverstone

  • Bore shallower than the engineering requires
  • Cage off centre, leaving uneven cover
  • Water or spoil sitting in the base
  • Cage lifted clear of the bottom
  • Reinforcement unsupported ahead of the pour
Condition summary at completion, Riverstone
Condition summary at completion
Sample findings

Sample defects found during our bored piers inspections in Riverstone

Annotated findings from Bored piers inspections on Riverstone builds. Client addresses withheld.

Overall condition, recorded during a handover inspection in Riverstone
Overall condition recorded at completion
Overall condition, recorded during a handover inspection in Riverstone
A second condition summary
Water ponding, recorded during a handover inspection in Riverstone
Water ponding on site
Caulking to slab and driveway join, recorded during a handover inspection in Riverstone
Slab to driveway join

The other stages of a Riverstone build

  1. Slab pre-pour inspection in Riverstone2Slab pre-pourThe day before the pour, steel and formwork complete
  2. Frame inspection in Riverstone3FrameOnce frame and trusses are up and the roof is on, before lining
  3. Lock-up (pre-plaster) inspection in Riverstone4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Riverstone5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Riverstone6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Riverstone7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Riverstone →

Guides

Construction stage guides for Riverstone

All guides →

Book a bored piers inspection in Riverstone

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Riverstone: common questions

How long does it take?

Under an hour on a typical lot, longer where the pier count is high.

And if a bore is shallow?

The measured depth goes in beside the required depth, and the remedy belongs to the builder and their engineer.

Do you certify footings?

No. We record against the engineering; certification is an engineer's function.

Does water in the bore matter?

It weakens the concrete at the base, so recording it means it is pumped out before the pour.

Is the flood history relevant here?

Indirectly. Ground conditions on land that inundates tend to be why an engineer specifies piers in the first place.

What should I send?

Your lot engineering with pier depths, diameters and positions.

CallGet a Free Quote