One element that has failed, set against what was required of it.
A defect investigation is measured against the approved drawings and engineering for the property, the National Construction Code, the Guide to Standards and Tolerances 2017 and the Australian Standard governing the element.
0 checkpoints across 0 areas on a standard Riverstone defect investigation report. We need the property accessible and, on a new build, the builder aware an independent inspector is attending. Anything not complete on the day is recorded as such rather than passed.
No defect grid appears here; the reason is above.
New Construction Stage Inspections Seven checks through a Riverstone build, written rather than illustrated.
Pre-Handover (PCI) Inspections The service Riverstone books, and the detailed part of this site.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1, old stock and new alike.
Building and Pest Inspections Both inspections in one attendance, reported apart. Instant online pricing, or talk to the booking team on 1300 471 805.
Often, and it is one of the more useful things an investigation does here. Water that entered because a river rose is a different matter to water that entered because a flashing was never compliant, and the two go to different parties.
We have not carried out a defect investigation in Riverstone. The page stays written rather than borrowing another suburb's findings.
It is prepared to be usable as evidence. Insurers set their own requirements, and where they want something more specific we can prepare it.