Waterproofing inspection in Riverstone

The membrane examined while it is still a membrane.

  • After the membrane is applied and before any tile is laid
  • About 1 hour on site
  • Report within 24 hours
Price your Riverstone inspectionSend the address and what you need.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the membrane is applied and before any tile is laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Riverstone waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Riverstone builds

Wet area rectification is the most expensive defect category in a new home, because correcting it after tiling means taking the room apart. Our Riverstone jobs picked up sealing and caulking still required to floors and walls at handover, along with a shower screen needing sealing, both of which are downstream of decisions made when the membrane went down. Every photograph on this page was taken at practical completion, not at this stage. They are here because each one is an item that belongs earlier in the build and survived to handover, which is the clearest argument we can make for inspecting when the work is still open.

What we find at this stage in Riverstone

  • Coverage short at walls and terminations
  • Junctions and penetrations not sealed
  • Falls not carrying water to the waste
  • Membrane damaged before tiling
  • Sealing and caulking left incomplete to floors and walls
A second penetration to seal, Riverstone
A second penetration to seal
Sample findings

Sample defects found during our waterproofing inspections in Riverstone

Annotated findings from Waterproofing inspections on Riverstone builds. Client addresses withheld.

Sealing and caulking required, recorded during a handover inspection in Riverstone
Sealing and caulking required to floor and walls
Sealing required to a shower screen, recorded during a handover inspection in Riverstone
Shower screen needing sealing
Rough sealant, recorded during a handover inspection in Riverstone
Sealant applied roughly
Service penetrations to be sealed and caulked, recorded during a handover inspection in Riverstone
Service penetration needing sealing

The other stages of a Riverstone build

  1. Bored piers inspection in Riverstone1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Riverstone2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Riverstone3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Riverstone4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Riverstone5FixingAfter mouldings, doors and joinery, before the painter
  6. Pre-handover (PCI) inspection in Riverstone7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Riverstone →

Guides

Construction stage guides for Riverstone

All guides →

Book a waterproofing inspection in Riverstone

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Riverstone: common questions

Which standard applies?

AS 3740 for domestic wet areas, alongside the National Construction Code and the ABCB Housing Provisions.

Do you flood test?

No. That test cuts into finished work and belongs to the waterproofer's own process.

How long is the window?

Often two or three days between the membrane curing and the tiler arriving.

What does failure look like later?

A damp skirting or a stain on the wall of the adjoining room, a year or two after moving in.

What if tiling has begun?

We assess what remains exposed and record the areas already covered.

Who fixes it?

The builder, coordinating waterproofer and tiler, and the report gives them the location and the clause.