The service this suburb actually books, and the one this site is built around.
A handover inspection is measured against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, AS 3700 for masonry, AS 3500 for plumbing and drainage and AS 3000 for the electrical clearances noted.
0 checkpoints across 0 areas on a standard Riverstone pre-handover (PCI) inspection. We need the property accessible and, on a new build, the builder aware an independent inspector is attending. Anything not complete on the day is recorded as such rather than passed.
All recorded at practical completion on Riverstone homes.








New Construction Stage Inspections Seven checks through a Riverstone build, written rather than illustrated.
Defect Investigation Reports One failure, and whether it was a defect or an event.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1, old stock and new alike.
Building and Pest Inspections Both inspections in one attendance, reported apart. Instant online pricing, or talk to the booking team on 1300 471 805.
Because they came up three different ways on these jobs: missing entirely, sitting higher than they should, and not resting on the flashing that is supposed to carry the water out. All three defeat the same drainage path.
A capping sheds water by falling away from the wall. Sloping back toward it, or not sloping at all, means water sits and then finds the joint underneath.
Two to three weeks. Any later and the builder has no window to rectify, which converts your list into a settlement argument.