Riverstone Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Handover inspection in Riverstone

The service Riverstone books us for, and the one this whole site is built around.

  • Two to three weeks before your handover date
  • 2 to 3 hours on site
  • Report within 24 hours
Price your Riverstone inspectionSend the address and what you need.

Fully licensed & accredited

Stage7 of 7
When to bookTwo to three weeks before your handover date
Time on site2 to 3 hours on site
Inspected againstThe Guide to Standards and Tolerances 2017, the NCC, your contract drawings and inclusions

What is included in a Riverstone pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Riverstone builds

Fifty six photographs from three Riverstone homes at practical completion, and they divide into two groups worth separating. The envelope items that should have been resolved much earlier: weep holes missing, at the wrong height, or not sitting on their flashing, damp proof course at the brickwork, flashings recorded non compliant, capping sloping the wrong way, ventilation insufficient. And the finish items that belong exactly here: caulking to windows and the driveway join, paint through common areas and bedrooms, damaged skirtings, cabinetry gaps, unsealed doors and a shower screen needing sealing.

What we find at this stage in Riverstone

  • Weep holes missing, at the wrong height, or off their flashing
  • Flashings non compliant and capping sloping the wrong way
  • Silt pit ponding and condensate discharging onto the ground
  • Light or switch inside the zone around a shower or bath
  • Caulking, paint, joinery and door seals through the dwelling
Caulking required at a window, Riverstone
Caulking required at a window
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Riverstone

Annotated findings from Pre-handover (PCI) inspections on Riverstone builds. Client addresses withheld.

Weep hole missing, recorded during a handover inspection in Riverstone
Weep hole missing
Weep hole height, recorded during a handover inspection in Riverstone
Weep hole at the wrong height
Insufficient or negative slope, recorded during a handover inspection in Riverstone
Capping sloping the wrong way
Light or switch too close to a shower, recorded during a handover inspection in Riverstone
Fitting too close to the shower

The other stages of a Riverstone build

  1. Bored piers inspection in Riverstone1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Riverstone2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Riverstone3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Riverstone4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Riverstone5FixingAfter mouldings, doors and joinery, before the painter
  6. Waterproofing inspection in Riverstone6WaterproofingAfter the membrane is applied and before any tile is laid

All construction stage inspections in Riverstone →

Guides

Construction stage guides for Riverstone

All guides →

Book a pre-handover (pci) inspection in Riverstone

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Riverstone: common questions

Why does this page have so much more on it?

Because handover is what Riverstone books, so it is where our whole published library for the suburb comes from. The rest of the site says so rather than pretending otherwise.

How do I use the envelope findings?

Press them hard. A missing weep hole at handover means opening finished brickwork, so the builder has every incentive to argue it is acceptable. It is not, and the report cites what it fails.

Is a light near a shower really a problem?

It is an electrical clearance requirement around wet areas, and we report it as a safety item rather than folding it into the finish list.

Do you come back?

Yes, as a separate visit that marks each item complete, part complete or outstanding.

How many items should I brace for?

Dozens on a new build. The number that matters is how it splits between envelope and finish.

When exactly should I book?

Two to three weeks before the date, so there is room for the builder to act and for us to verify.

CallGet a Free Quote