Frame inspection in Riverstone

The structure while every fixing can still be counted.

  • Once frame and trusses are up and the roof is on, before lining
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Riverstone inspectionSend the address and what you need.

Fully licensed & accredited

Stage3 of 7
When to bookOnce frame and trusses are up and the roof is on, before lining
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Riverstone frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Riverstone builds

A frame inspection reads the tie down chain against your engineering, bolt by bolt and strap by strap, and checks that nothing has been cut, notched or damaged by the trades that followed the carpenter. Riverstone has not booked us for enough frame work to build a library here, so this page describes what we check. Every photograph on this page was taken at practical completion, not at this stage. They are here because each one is an item that belongs earlier in the build and survived to handover, which is the clearest argument we can make for inspecting when the work is still open.

What we find at this stage in Riverstone

  • Tie down bolts, straps and grips against the schedule
  • Bearing at supports and beam connections
  • Studs and plates notched or damaged by following trades
  • Bracing installed and tensioned
  • Roof bracing and truss tie downs in place
Ventilation recorded as insufficient, Riverstone
Ventilation recorded as insufficient
Sample findings

Sample defects found during our frame inspections in Riverstone

Annotated findings from Frame inspections on Riverstone builds. Client addresses withheld.

Damage, recorded during a handover inspection in Riverstone
Damage to skirtings and architraves
Damage, recorded during a handover inspection in Riverstone
Further damage recorded
Damage, recorded during a handover inspection in Riverstone
A third damaged element
Overall condition, recorded during a handover inspection in Riverstone
Overall condition summary

The other stages of a Riverstone build

  1. Bored piers inspection in Riverstone1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Riverstone2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Lock-up (pre-plaster) inspection in Riverstone4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Riverstone5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Riverstone6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Riverstone7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Riverstone →

Guides

Construction stage guides for Riverstone

All guides →

Book a frame inspection in Riverstone

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Riverstone: common questions

Why does the tie down chain matter?

It is the continuous run of fixings resisting uplift, from roof to slab. Each link is sized for a load, and one missing link is where the chain gives.

How long does a frame visit take?

Two to three hours single storey, more on a two storey where the upper frame must be reached safely.

What if a trade has notched a member?

Timber framing standards cap how deep a notch may be for a given member and where it may sit. Past that cap the member no longer carries what it was sized for, and it is written up as a structural item.

Are the items rechecked?

At lock-up, with each marked complete, part complete or outstanding.

Will the builder act?

Usually, because frame items are inexpensive then and costly to dispute afterwards.

What should I send?

Your engineering and the tie down schedule that comes with it.